PDA

View Full Version : Buildings build time thread?



cwracing
05-10-2012, 09:43 PM
Is there a thread somewhere with the build times for money buildings?
I have tried searching and not found anything yet. Would rather ask this way than one building at a time as I progress.

MaDrAvEr
05-10-2012, 09:46 PM
Look up sticky thread 'best of the best' n click money building spreadsheet  has everything u desire

Plumbernick9
05-10-2012, 09:46 PM
Check the money buildings spreadsheet in the best of the best stickies.

MaDrAvEr
05-10-2012, 09:46 PM
Its at the top of general threads 

Nicholost
05-10-2012, 09:57 PM
While Tramp Stamp's spreadsheet is great (the one the previous posters are suggesting), I've become a big fan of itzkakarot's spreadsheet.

http://www.funzio.com/forum/showthread.php?23571-Hood-Planning-Spreadsheet

cwracing
05-10-2012, 10:02 PM
I got the spreadsheet to work but how accurate are the build times?
The upgrade times seem to be off on the few that I checked.

Nicholost
05-10-2012, 10:17 PM
I got the spreadsheet to work but how accurate are the build times?
The upgrade times seem to be off on the few that I checked.

Do you have the Loaded Dice? Neither of those spreadsheets account for any of the modifiers available from any of the top special event items.

Personally, I'd use itzkakarot's spreadsheet. It has probably been updated more recently.

cwracing
05-10-2012, 10:19 PM
Yes I do have the loaded dice. I wasn't thinking about them. Knowing the build times is sure nice for syncing things.

deuces
05-10-2012, 10:34 PM
Would there be an easy way on these spreadsheets for me to take 25% build time off everything and 30% cost off everything? I've done it manually inputting to white frogs goal calculator, but it'd be nice if it was as easy as telling it to multiply this column by .75 or whatever was needed.

jaywalker
05-11-2012, 12:28 AM
Add a new column.

If the build time is K1,

=K1*0,75

In the new column

@deuces do the same and call it something like "upgrade Minigun", just don't reduce the cost for building the building.

deuces
05-11-2012, 01:15 AM
awesome ty jay. is there a way that i can make the entire column function this way without putting =k1*0,75 then =k2 =k3 etc?

edit: meh, never mind, easy enough just do it for the buildings i call about.

jaywalker
05-11-2012, 09:12 AM
When you open the spreadsheet and look at all the buildings, it takes about 5 seconds to add it on all.

Go to the very bottom, write in this:
=k1 (building price is not cheaper)
=k2*0,7
=k3*0,7
=k4*0,7
=k5*0,7
=k6*0,7
=k7*0,7
=k8*0,7
=k9*0,7
=k10*0,7

Copy all ofit. Click on the next blank, hold shift+control and click "up arrow", let go of the control button and click "down arrow". Now you have marked the whole column :)